Job Statistical Report - City Of New York
Extension of 1st and 2nd floor. new attach garage. renovation of existing floor. obtain new c of o. 87-43 123 street umer shah vickram jagernauth 87-43 123 st queens ny 11418 filing to raleigh nc 27615 ... Read Full Source
TRAILBOSS INTERPRISES, INC - GSA Advantage
The Maintenance Scheduler contacts garage to verify availability of facilities, on floor or on shelves according to identifying information such as style, size or type of material, fills orders or issues supplies from stock 7 North Carolina. 5 New York. 5 New Hampshire. 3 Nebraska. 3 ... Content Retrieval
Job Statistical Report - Welcome To NYC.gov
REPLACEMENT OF 200 L.F. JOISTS AND FLOOR REPAIRS AS SHOWN IN PLANS PROVIDED. NO CHANGE IN USE, EGRESS OR OCCUPANCY. CHARLOTTE WORELEY Propose to install new construction fence @ the property line. No change to use,egress or occupancy. 104405519 ... View Full Source
Job Statistical Report - Welcome To NYC.gov
Mechanical, plumbing, and sprinkler work subsequent to work on the twentieth floor. no change to use egress or occupancy. second avenue gen add plumbing work type at detached garage for storm water piping hart st. silberstein charlotte r dewald gregg s wolpert 122 e 42 st llc by 122 e 42 ... Retrieve Here
Hand Grinding epoxy Flooring - YouTube
Hand grinding the edges for epoxy floor installation is critical. Epoxy flooring will start to fail at the edges if not properly prepared. Contact Us: Liquid ... View Video
Power Trowel epoxy Flooring - YouTube
Proper power troweling is important to ensure that your epoxy floor resurfacer achieves it's maximum compressive strength. Contact Us: Liquid Floors, Inc. 11 Akron Drive, Greenville, SC 29605 864-299-1958 Liquid Floors, Inc. 10801 Johnston Road, Suite #215, Charlotte, NC 28226 704-543 ... View Video
Procurement Stewardship Act Report
Charlotte nc 28260 usa 3 pc65016 floor machines prc supplies inc 48 kathleen dr stratford ct 06614 usa ps57145 garage equipment and vehicle lifts (statewide) dover industrial productsrotary lift division 2700 lanier dr madison in 47250 usa ... Read Document
DRAFT 2007 Florida Specific Requirements Supplement
PREFACE. Change to read as shown: The base codes for the 2010 edition of the Florida Building Code include: the International Building Code, 2009 edition; the International Plumbing Code, 2009 edition; the International Mechanical Code, 2009 edition; the International Fuel Gas Code, 2009 edition ... Get Doc
Sfdbi.org
3 7/10/2013 3/3/2014 9 3/3/2015 30000 45000 1 1 2 3 3 2 20 1364 41 321 4155590645 2011. 3 7/25/2013 3/3/2014 9 3/3/2015 30000 50000 1 2 2 2 2 1 3 4085 10 858 4158108609 309. 8 10/18/2013 ... Doc Viewer
Material Safety Data Sheet - BP Global
Material Safety Data Sheet 1 .Identification of the material and supplier Product name BP Premium Unleaded Petrol Historic SDS no. 876 SDS no. 0000002734 ... Access Full Source
Www.construction.com
Finished Floor Work Finishing-of Floors Flagstone Flooring Work Flg-Seamless Doors-Garage or Hangar Doors-Ornamental Metal Doors-Overhead Type & Rolling Doors-Revolving Charlotte, NC Planroom PLRMNCGR Greensboro, NC Planroom PLRMNCRA Raleigh, NC Planroom ... Read Full Source
Www.cityofchicago.org
2nd Floor Appliances, Small, Electric (Not Otherwise Classified); Charlotte Stratford Services, Inc. 630-980-5019 630-980-5061 WINDOW AND EPOXY RESTORATION; CUSTOM MILLING; SUPPLIER OF GLASS PLASTICS AND WOOD (RAW & MILLED) ... Doc Retrieval
Procurement Stewardship Act Report - Osc.state.ny.us
Charlotte nc 28260 usa 3 pc65016 culvert & underdrain pipe & tubing metal & plastic (statewide) lane enterprises inc garage equipment and vehicle lifts (statewide) dover industrial productsrotary lift division 2700 lanier dr madison in 47250 usa ... View This Document
E-archives.sc.gov
SOUTHERN STAIRCASE OF NORTH CAROLINA, INC Southern Staircase of North Carolina Inc (803) 786-8000 Industrial floor coatings -polyurea applicators Osborn Jim Osborn Charlotte Gonzalez Procurement Specialist Research and development ... Access Doc
Www.deq.state.mi.us
Cathodically Protected Steel,Composite(Steel w/Fiberglass),Epoxy Coated Steel Charlotte NC 28269-9786 (313) 353-8960 00040713 Dg Trim Products 820 Long Lake Ave 49707-1855 Steven T Mason Bldg 3rd Floor Lansing 48909 (517) 241-2927 00009467 Alpena State Police Post ... Read Content
Handicap Ramp Design And Construction Guidelines
1/31/2015 1 Handicap Ramp Design and Construction Guidelines Wheelchair Ramp Accessibility Program (WRAP) and Rockwell Collins Retiree Volunteers (RCRV) ... Get Content Here
Www.floridabuilding.org
This paragraph does not include any document for the replacement or repair of an existing 903.6 shall include the parking garage as a story. The floor assembly between the parking garage and the Group R above shall for which a permit for new construction is issued and ... Return Document
Www.cityofchicago.org
Asphalt Concrete Epoxy Construction Services, Inc. D/B/A ACE Construction Management, Inc. Coatings, Protective (For Masonry Including Concrete Floor);Resins (Epoxy Only);Resins (For Repair and Restoration): Acrylic, Epoxy, etc. Nicholas NC Sherry Cheesecakes By Jr, Inc. 773-465-6733 773 ... Content Retrieval
2008-2009 Cost Comparisons For - BIA Southeast
2008-2009 Cost Comparisons for Common Commercial Wall Systems Conducted in eleven cities in nine states in the JACKSON CHARLOTTE TRIANGLE CHARLESTON GREENVILLE NASHVILLE MS NC NC SC SC TN 1. Brick Veneer & Metal Stud 19.87 21.04 20.58 19.52 19.88 20.20 ... View This Document
Job Statistical Report - Welcome To NYC.gov
Legalize bathroom and relocated kitchen @ basement floor- eliminate garage. obtain new certificate of occupancy- "no work" permit to be issued barry street thomas j petracca new 4th floor and penthouse vertical enlargement, ... Retrieve Content
No comments:
Post a Comment